Here is the formula,
P.042.5 cement: 144KG fly ash II grade:36KG
yellow sand fineness around 2.0 : 820KG
hydroxypropyl methyl cellulose ether :130 g K12:35g water: 154
wet density is 1698
The plastering has wall cracks in the inner layer of the construction site. The basement is intact. Workers report cracks in the first layer, and the second layer also appeared before the initial setting.
P.042.5 cement: 144KG fly ash II grade:36KG
yellow sand fineness around 2.0 : 820KG
hydroxypropyl methyl cellulose ether :130 g K12:35g water: 154
wet density is 1698
The plastering has wall cracks in the inner layer of the construction site. The basement is intact. Workers report cracks in the first layer, and the second layer also appeared before the initial setting.