Here is the formula,
P.042.5 cement: 144KG fly ash II grade:36KG
yellow sand fineness around 2.0 : 820KG
hydroxypropyl methyl cellulose ether :130 g K12:35g water: 154
wet density is 1698
The plastering has wall cracks in the inner layer of the construction site. The basement is intact. Workers...
The samples sent by the additive manufacturer lasted about 20 hours on the wall. The first one was that he put in cellulose ether, but he felt that the cement had been pulverized and the powder fell seriously. So the second one was better without putting in the cellulose ether. So the product is...
As shown in the picture, the overall smearing is okay, but the bulge appears within a few minutes after plastering and where is prone to cracking the next day; even watering cannot solve the bulge. Does anyone know what's going on?